On this project at 201 Formosa Dr, Point Comfort, TX 77978 there have been 0 permits filed, 81 preliminary notices exchanged, 8 lien waivers exchanged between companies and 16 liens filed. Below you can find when the various project and payment events occurred over the last several years of data where available. You can also report a payment event if you’re on this project.
0
PERMITS FILED
81
PRELIMINARY NOTICES
8
LIEN WAIVERS
16
LIEN HISTORY
10/15/2024
Slow Payment Reported Against Hpc Industrial Services
Over $1,000
Source: Levelset Data
10/15/2024
Slow Payment Reported Against Bay LTD, Formosa Plastics Corporation Texas
Over $60,000
Source: Levelset Data
10/15/2024
Slow Payment Reported Against Amerapex Corporation
Less than $1,000
Source: Levelset Data
10/04/2024
Lien threat sent to Formosa Plastics Corporation Texas, Veolia Wts Services Usa
Over $10,000
Source: Levelset Data
09/13/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, HMT Tank Service
Over $1,000
Source: Levelset Data
09/13/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Ultimate Industrial Group
Over $10,000
Source: Levelset Data
09/13/2024
Slow Payment Reported Against Accurate Welding & Inspection, Formosa Plastics Corporation Texas
Over $5,000
Source: Levelset Data
09/13/2024
Slow Payment Reported Against Bay LTD, Formosa Plastics Corporation Texas
Over $60,000
Source: Levelset Data
08/15/2024
Slow Payment Reported Against Lavaca Navidad River Authority, Udelhoven Oilfield System Services
Over $10,000
Source: Levelset Data
08/15/2024
Slow Payment Reported Against Bay LTD, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
08/15/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Ultimate Industrial Group
Over $10,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Locke Solutions
Over $1,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against Debusk, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against Bay LTD, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Lavaca Navidad River Authority, Masters911 Electrical & Instrumentation
Over $10,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, HMT Tank Service
Over $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Lavaca Navidad River Authority, Thorpe Plant Services
Over $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Debusk, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Civil Mechanical, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Pro Mechanica
Over $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Richard Industrial Group
Over $10,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Precision Ndt
Over $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against 151 Alamo Ranch Partners Ltd., Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Miller Integrated
Over $5,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, HMT Tank Service
Over $10,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Bay LTD, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Texas Steel Industrial Placing
Less than $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
06/10/2024
Lien filed by Momentum Rental & Sales | Claimant directly hired by GC
Lien filed against Bay LTD, Formosa Plastics Corporation Texas
GC listed on lien: Bay LTD
Property Owner: Formosa Plastics Corporation Texas
$107,951
Source: Levelset Data
05/30/2024
Lien filed by Momentum Rental & Sales
Lien filed against Usa Technologies
$37,206
Source: Levelset Data
05/15/2024
Slow Payment Reported Against Debusk
Over $10,000
Source: Levelset Data
05/15/2024
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
05/15/2024
Slow Payment Reported Against HMT Tank Service
Over $10,000
Source: Levelset Data
05/15/2024
Slow Payment Reported Against Richard Industrial Group
Over $60,000
Source: Levelset Data
05/15/2024
Slow Payment Reported Against Bay LTD
Over $60,000
Source: Levelset Data
05/15/2024
Slow Payment Reported Against Miller Integrated
Over $10,000
Source: Levelset Data
05/15/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas, Udelhoven Oilfield System Services
Over $60,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Precision Ndt
Over $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Miller Integrated
Over $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Tandem Services
Over $10,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Amerapex Corporation
Over $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Debusk
Less than $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Thermon
Over $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against HMT Tank Service
Less than $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Group Contractors
Less than $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against PCL Industrial Construction Co.
Over $10,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Bilfinger Westcon, Inc. Dba Bilfinger North America Inc.
Over $10,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Bay LTD
Over $60,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Clark Constructors
Over $10,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Richard Industrial Group
Over $10,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against Masters911 Electrical & Instrumentation
Less than $1,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against Precision Ndt
Over $1,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against HMT Tank Service
Less than $1,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
03/08/2024
Lien threat sent to Formosa Plastics Corporation Texas, Ultimate Industrial Group
Over $10,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Reed Industrial System
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Locke Solutions
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Thorpe Plant Services
Over $5,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Thorpe Plant Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $10,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against United Site Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Usa Technologies
Over $5,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
02/07/2024
Slow Payment Reported Against Elite Construction And Electrical, Formosa Plastics Corporation Texas
Over $60,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $10,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Entact, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Miller Integrated
Over $10,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Thorpe Plant Services
Over $5,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Tandem Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Southern Gulf Solutions LLC
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Tandem Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Tandem Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Tandem Services
Over $5,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Tandem Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $5,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against 151 Alamo Ranch Partners Ltd.
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $10,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $5,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $5,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $5,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Richard Industrial Group
Over $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Locke Solutions
Over $5,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Locke Solutions
Over $10,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Houston Controls, Inc.
Over $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Locke Solutions
Less than $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Southern Gulf Solutions LLC
Less than $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Southern Gulf Solutions LLC
Over $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Richard Industrial Group
Over $10,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Usa Technologies
Over $5,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Thorpe Plant Services
Less than $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against HMT Tank Service
Over $1,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Performance Contractors, Inc
Over $1,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Entact
Over $10,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Usa Technologies
Over $5,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Locke Solutions
Over $5,000
Source: Levelset Data
09/13/2023
Lien filed by Msi Supply
Lien filed against Formosa Plastics Corporation Texas, Ultimate Industrial Group
Property Owner: Formosa Plastics Corporation Texas
$72,802
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Performance Contractors, Inc
Over $1,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Usa Technologies
Less than $1,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Locke Solutions
Less than $1,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Usa Technologies
Less than $1,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against United Site Services
Over $10,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Texas Steel Industrial Placing
Over $10,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Formosa Utility Venture, Texas Steel Industrial Placing
Over $10,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
08/11/2023
Slow Payment Reported Against Clark Constructors, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Texas Steel Industrial Placing
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Formosa Utility Venture, Texas Steel Industrial Placing
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Entact, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
06/21/2023
Lien threat sent to Maverick Maintenance & Supply
Over $10,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against United Site Services
Over $5,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Formosa Utility Venture, Texas Steel Industrial Placing
Over $10,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Usa Technologies
Less than $1,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Texas Steel Industrial Placing
Over $10,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Southern Gulf Solutions LLC
Less than $1,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Houston Controls, Inc.
Less than $1,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Houston Controls, Inc.
Less than $1,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Houston Controls, Inc.
Over $10,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Houston Controls, Inc.
Over $1,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Houston Controls, Inc.
Over $5,000
Source: Levelset Data
05/15/2023
Slow Payment Reported Against BrandSafway
Less than $1,000
Source: Levelset Data
05/15/2023
Slow Payment Reported Against Usa Technologies
Over $5,000
Source: Levelset Data
05/15/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
04/27/2023
Slow Payment Reported Against Bridges Specialties, Formosa Plastics Corporation Texas
Over $60,000
Source: Levelset Data
04/17/2023
Lien threat sent to Eagle Industrial Plant Services Corporation
Over $10,000
Source: Levelset Data
04/17/2023
Lien threat sent to Eagle Industrial Plant Services Corporation
Over $10,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Thorpe Plant Services
Over $10,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Diamond Services
Less than $1,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Thorpe Plant Services
Over $1,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against BrandSafway
Less than $1,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against PCL Industrial Construction Co.
Over $5,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $60,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against United Site Services
Over $1,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Formosa Plastics Corporation Texas, Usa Technologies
Over $5,000
Source: Levelset Data
04/14/2023
Lien filed by Equipmentshare
Lien filed against Eagle Industrial Plant Services Corporation, Formosa Plastics Corporation Texas
Property Owner: Formosa Plastics Corporation Texas
$10,867
Source: Levelset Data
04/07/2023
Slow Payment Reported Against Bridges Specialties
Over $60,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Allison Industrial Services LLC
Over $5,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Formosa Plastics Corporation Texas, Usa Technologies
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Eagle Industrial Plant Services Corporation, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Eagle Industrial Plant Services Corporation
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Anderson Pollution Control
Less than $1,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Entact
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Eagle Industrial Plant Services Corporation
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Eagle Industrial Plant Services Corporation
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Austin Fire Systems, LLC
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Thorpe Plant Services
Over $1,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Anderson Pollution Control
Less than $1,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Tasf Dba Turnaround Special Forces
Over $1,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Entact
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Eagle Industrial Plant Services Corporation
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against United Site Services
Over $5,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
02/14/2023
Slow Payment Reported Against Eagle Industrial Plant Services Corporation
Over $10,000
Source: Levelset Data
02/08/2023
Slow Payment Reported Against Bridges Specialties, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
01/13/2023
Lien filed by Palacios Marine
Lien filed against Formosa Plastics Corporation Texas, Ultimate Industrial Group
GC listed on lien: Palacios Marine
Property Owner: Formosa Plastics Corporation Texas
$14,695
Source: Levelset Data
12/15/2022
Slow Payment Reported Against United Site Services
Over $1,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Richard Industrial Group
Less than $1,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Miller Environmental Services LLC
Over $1,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against United Site Services
Over $1,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Pilings
Over $60,000
Source: Levelset Data
08/15/2022
Slow Payment Reported Against United Site Services
Over $5,000
Source: Levelset Data
08/09/2022
Slow Payment Reported Against Pilings
Over $60,000
Source: Levelset Data
08/01/2022
Lien filed by Meever Usa
Lien filed against Pilings
Property Owner: Formosa Plastics Corporation Texas
$116,085
Source: Levelset Data
07/28/2022
Lien threat sent to Pilings
Over $60,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Midwest Steel Company Inc. (TX)
Over $1,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Allison Industrial Services LLC
Over $10,000
Source: Levelset Data
06/08/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Texas Steel Industrial Placing
Over $60,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Texas Steel Industrial Placing
Over $10,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Allison Industrial Services LLC
Over $10,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against J V Driver Industrial Services Inc
Over $1,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Amerapex Corporation, Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Eagle Industrial Plant Services Corporation
Less than $1,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Thorpe Plant Services
Over $1,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Midwest Steel Company Inc. (TX)
Over $1,000
Source: Levelset Data
05/02/2022
Lien filed by Classic Industrial Services
Lien filed against Diamond Scaffold Services L L C, Formosa Plastics Corporation Texas
Property Owner: Formosa Plastics Corporation Texas
$44,628
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Texas Steel Industrial Placing
Over $1,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Otz Americas
Less than $1,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Amerapex Corporation
Less than $1,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Eagle Industrial Plant Services Corporation
Less than $1,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Turnaround Equipment Leasing
Over $1,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Thorpe Plant Services
Over $1,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Allison Industrial Services LLC
Over $10,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Precision Ndt
Over $1,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Texas Steel Industrial Placing
Over $1,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $1,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Thorpe Plant Services
Over $1,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Precision Ndt
Over $1,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Travis Industries
Less than $1,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Allison Industrial Services LLC
Over $10,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Suez Wts Solutions Usa
Over $10,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Allison Industrial Services LLC
Over $10,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Precision Ndt
Less than $1,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Texas Steel Industrial Placing
Over $1,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Udelhoven Oilfield System Services
Over $5,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Texas Steel Industrial Placing
Over $5,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Bluestar I E Automation, Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Turnaround Equipment Leasing
Over $1,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Suez Wts Solutions Usa
Over $10,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Usa Technologies
Over $1,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Thorpe Plant Services
Over $1,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Con Metal Contractors, Formosa Plastics Corporation Texas
Over $5,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Allison Industrial Services LLC
Over $1,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Texas Steel Industrial Placing
Less than $1,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against J V Driver Industrial Services Inc
Over $1,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Formosa Plastics Corporation Texas, Miller Environmental Services LLC
Over $1,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Thorpe Plant Services
Over $1,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Thorpe Plant Services
Over $5,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Formosa Plastics Corporation Texas, Turnaround Equipment Leasing
Over $1,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Udelhoven Oilfield System Services
Less than $1,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Formosa Plastics Corporation Texas, Turnaround Equipment Leasing
Over $1,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Versa Integrity
Over $10,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Allison Industrial Services LLC
Over $1,000
Source: Levelset Data
05/14/2021
Lien filed by Apache Undustrial Services
Lien filed against Formosa Plastics Corporation Texas
Property Owner: Formosa Plastics Corporation Texas
$547,121
Source: Levelset Data
04/16/2021
Lien filed by MMR Constructors
Lien filed against Klong Technology Company, Nan Y Aplastics Corporation
$26,832
Source: Levelset Data
04/15/2021
Slow Payment Reported Against Bay LTD, Formosa Plastics Corporation Texas
Over $60,000
Source: Levelset Data
03/15/2021
Slow Payment Reported Against Bay LTD, Formosa Plastics Corporation Texas
Over $60,000
Source: Levelset Data
03/15/2021
Slow Payment Reported Against J V Driver Industrial Services Inc
Less than $1,000
Source: Levelset Data
03/09/2021
Lien filed by Smith & Loveless
Lien filed against Formosa Plastics Corporation Texas, Great River Industries, Suez Treatment Solutions
GC listed on lien: Great River Industries
Property Owner: Formosa Plastics Corporation Texas
$360,101
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Formosa Plastics Corporation Texas, Ultimate Industrial Group
Over $10,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Versa Integrity
Over $10,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Civil Mechanical
Over $10,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Debusk
Over $10,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Civil Mechanical
Over $10,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Debusk, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
01/05/2021
Lien filed by Ganem & Kelly Surveying, Inc. | Claimant directly hired by GC
Lien filed against Diamond K Services, Formosa Plastics Corporation Texas
GC listed on lien: Diamond K Services
Property Owner: Formosa Plastics Corporation Texas
$8,920
Source: Levelset Data
12/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
12/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
12/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Ultimate Industrial Group
Over $1,000
Source: Levelset Data
11/13/2020
Lien filed by Tekko Enterprises
Lien filed against Formosa Plastics Corporation Texas, Great River Industries, Smith & Loveless
GC listed on lien: Great River Industries
Property Owner: Formosa Plastics Corporation Texas
$258,346
Source: Levelset Data
11/13/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $5,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Texas Steel Industrial Placing
Over $1,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Trinity Industrial Services
Over $5,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Performance Contractors, Inc
Over $5,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against BRACE Industrial Group, Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against BRACE Industrial Group
Over $5,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Wolfenson Electric
Less than $1,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Diamond K Services, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Wison Petrochemicals Na
Over $10,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Dimension Energy Services
Over $10,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Debusk, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Usa Technologies
Over $10,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Debusk
Over $10,000
Source: Levelset Data
09/15/2020
Slow Payment Reported Against BRACE Industrial Group
Less than $1,000
Source: Levelset Data
09/15/2020
Slow Payment Reported Against Vicon Equipment
Over $5,000
Source: Levelset Data
09/15/2020
Slow Payment Reported Against 3J Ryan Inc, Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
09/15/2020
Slow Payment Reported Against Trinity Industrial Services
Over $1,000
Source: Levelset Data
09/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Trinity Industrial Services
Over $1,000
Source: Levelset Data
08/14/2020
Slow Payment Reported Against Trinity Industrial Services
Over $1,000
Source: Levelset Data
08/14/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Specialty Industrial
Over $5,000
Source: Levelset Data
07/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Specialty Industrial
Over $10,000
Source: Levelset Data
06/15/2020
Slow Payment Reported Against Diamond K Services, Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
06/15/2020
Slow Payment Reported Against Debusk, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
06/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Wison Petrochemicals Na
Over $10,000
Source: Levelset Data
06/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Wison Petrochemicals Na
Over $5,000
Source: Levelset Data
06/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
05/26/2020
Lien threat sent to American Crossings Kaldan
Over $5,000
Source: Levelset Data
05/15/2020
Slow Payment Reported Against Potent Usa, Scoppa Gmbh Usa
Over $10,000
Source: Levelset Data
05/15/2020
Slow Payment Reported Against BrandSafway, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
05/15/2020
Slow Payment Reported Against Dimension Energy Services , Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
05/15/2020
Slow Payment Reported Against BrandSafway, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
05/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Imerys Perlite Usa
Over $10,000
Source: Levelset Data
05/15/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Richard Automation
Over $10,000
Source: Levelset Data
05/15/2020
Slow Payment Reported Against American Crossings Kaldan, Diamond K Services, Formosa Plastics Corporation Texas
Over $5,000
Source: Levelset Data
04/15/2020
Slow Payment Reported Against American Crossings Kaldan, Diamond K Services
Over $10,000
Source: Levelset Data
04/15/2020
Slow Payment Reported Against Brahma Group, Inc.
Over $10,000
Source: Levelset Data
04/15/2020
Slow Payment Reported Against Challenger Services
Over $1,000
Source: Levelset Data
04/15/2020
Slow Payment Reported Against Debusk, Formosa Plastics Corporation Texas
Over $5,000
Source: Levelset Data
04/15/2020
Slow Payment Reported Against Brahma Group, Inc.
Over $10,000
Source: Levelset Data
04/15/2020
Slow Payment Reported Against American Crossings Kaldan, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
04/15/2020
Slow Payment Reported Against BrandSafway
Over $10,000
Source: Levelset Data
04/15/2020
Slow Payment Reported Against Group Contractors, TWA Erectors LLC
Less than $1,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against MMR Constructors
Over $10,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, MMR Constructors
Over $10,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Industry Services Company
Over $1,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Richard Automation
Over $10,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, MMR Constructors
Over $10,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Process Service Specialists LLC
Over $1,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against American Crossings Kaldan
Over $10,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Houston Controls, Inc.
Over $1,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Texas Steel Industrial Placing
Less than $1,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against PCL Industrial Construction Co.
Over $60,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Group Contractors, TWA Erectors LLC
Over $5,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Group Contractors, TWA Erectors LLC
Over $5,000
Source: Levelset Data
03/13/2020
Slow Payment Reported Against Commercial Siding & Maintenance
Over $5,000
Source: Levelset Data
03/10/2020
Lien filed by American Crossings Kaldan | Claimant directly hired by GC
Lien filed against Diamond K Services, Formosa Plastics Corporation Texas
GC listed on lien: Diamond K Services
Property Owner: Formosa Plastics Corporation Texas
$754,880
Source: Levelset Data
03/03/2020
Slow Payment Reported Against Diamond K Services
Over $60,000
Source: Levelset Data
02/14/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Group Contractors, TWA Erectors LLC
Over $5,000
Source: Levelset Data
02/14/2020
Slow Payment Reported Against Group Contractors, TWA Erectors LLC
Over $5,000
Source: Levelset Data
02/14/2020
Slow Payment Reported Against Cajun Constructors, LLC, Formosa Plastics Corporation Texas, Richard Automation
Over $10,000
Source: Levelset Data
02/12/2020
Slow Payment Reported Against Formosa Plastics Corporation Texas, Wison Petrochemicals Na
Over $60,000
Source: Levelset Data
02/12/2020
Slow Payment Reported Against Debusk, Formosa Plastics Corporation Texas
Over $1,000
Source: Levelset Data
01/15/2020
Slow Payment Reported Against Cajun Constructors, LLC, Formosa Plastics Corporation Texas, Richard Automation
Over $10,000
Source: Levelset Data
01/15/2020
Slow Payment Reported Against Cajun Constructors, LLC, Richard Automation
Over $10,000
Source: Levelset Data
12/13/2019
Slow Payment Reported Against Cajun Constructors, LLC, Formosa Plastics Corporation Texas, Richard Automation
Over $10,000
Source: Levelset Data
12/13/2019
Slow Payment Reported Against Dimension Energy Services
Over $60,000
Source: Levelset Data
12/13/2019
Slow Payment Reported Against PCL Industrial Construction Co.
Over $60,000
Source: Levelset Data
11/15/2019
Slow Payment Reported Against Formosa Plastics Corporation Texas
Over $5,000
Source: Levelset Data
10/15/2019
Slow Payment Reported Against Benchmark Houston Builders , Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
10/15/2019
Slow Payment Reported Against Benchmark Houston Builders
Over $10,000
Source: Levelset Data
09/13/2019
Slow Payment Reported Against Great River Industries
Over $10,000
Source: Levelset Data
09/13/2019
Slow Payment Reported Against Benchmark Houston Builders
Over $10,000
Source: Levelset Data
09/13/2019
Slow Payment Reported Against Formosa Plastics Corporation Texas, Great River Industries
Less than $1,000
Source: Levelset Data
08/15/2019
Slow Payment Reported Against Formosa Plastics Corporation Texas, Sylva Construction Company
Over $5,000
Source: Levelset Data
07/15/2019
Slow Payment Reported Against Cajun Constructors, LLC, Formosa Plastics Corporation Texas
Over $10,000
Source: Levelset Data
06/14/2019
Slow Payment Reported Against Dunn Services, Inc. (TX), Formosa Plastics Corporation Texas
Over $5,000
Source: Levelset Data
02/13/2019
Slow Payment Reported Against Formosa Plastics Corporation Texas, Great River Industries
Less than $1,000
Source: Levelset Data
01/16/2019
Slow Payment Reported Against Formosa Plastics Corporation Texas, Great River Industries
Less than $1,000
Source: Levelset Data
10/11/2018
Slow Payment Reported Against 3J Ryan Inc, Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
10/11/2018
Slow Payment Reported Against Formosa Plastics Corporation Texas, Palacios Marine
Less than $1,000
Source: Levelset Data
10/11/2018
Slow Payment Reported Against 3J Ryan Inc
Less than $1,000
Source: Levelset Data
09/15/2018
Slow Payment Reported Against 3J Ryan Inc, Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
09/15/2018
Slow Payment Reported Against 3J Ryan Inc
Less than $1,000
Source: Levelset Data
09/15/2018
Slow Payment Reported Against 3J Ryan Inc, Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
07/14/2018
Slow Payment Reported Against 3J Ryan Inc
Less than $1,000
Source: Levelset Data
06/16/2018
Slow Payment Reported Against Formosa Plastics Corporation Texas, Palacios Marine
Less than $1,000
Source: Levelset Data
05/03/2018
Lien filed by Aerial Access Equipment
Lien filed against Tpis Industrial Services
Property Owner: Formosa Plastics Corporation Texas
$25,960
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Volt Electrical Systems LLC
Less than $1,000
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Superior Building Systems (TX)
Less than $1,000
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Godwin Formwork Solutions, Inc
Less than $1,000
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Formosa Plastics Corporation Texas, Volt Electrical Systems LLC
Less than $1,000
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Houston Controls, Inc., Superior Building Systems (TX)
Less than $1,000
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Formosa Plastics Corporation Texas, Palacios Marine
Less than $1,000
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Formosa Plastics Corporation Texas, Volt Electrical Systems LLC
Less than $1,000
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Volt Electrical Systems LLC
Less than $1,000
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Volt Electrical Systems LLC
Less than $1,000
Source: Levelset Data
04/25/2018
Slow Payment Reported Against Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
04/25/2018
Lien threat sent to Superior Building Systems (TX)
Less than $1,000
Source: Levelset Data
04/25/2018
Lien threat sent to Built Wright Construction
Less than $1,000
Source: Levelset Data
04/24/2018
Slow Payment Reported Against Godwin Formwork Solutions, Inc
Less than $1,000
Source: Levelset Data
04/24/2018
Lien threat sent to Formosa Plastics Corporation Texas, Volt Electrical Systems LLC
Less than $1,000
Source: Levelset Data
04/24/2018
Slow Payment Reported Against Formosa Plastics Corporation Texas, Volt Electrical Systems LLC
Less than $1,000
Source: Levelset Data
04/24/2018
Slow Payment Reported Against Formosa Plastics Corporation Texas
Less than $1,000
Source: Levelset Data
04/24/2018
Slow Payment Reported Against Volt Electrical Systems LLC
Less than $1,000
Source: Levelset Data
04/24/2018
Slow Payment Reported Against Formosa Plastics Corporation Texas, Palacios Marine
Less than $1,000
Source: Levelset Data
03/12/2018
Lien filed by Concrete Willies Foundation Drilling
Lien filed against Formosa Plastics Corporation Texas, Volt Electrical Systems LLC
Property Owner: Formosa Plastics Corporation Texas
$6,233
Source: Levelset Data
09/06/2013
Lien filed by MYOCO – Pipeline Equipment Co.
Lien filed against Burrow Global Construction, Calhoun County Clerk's Office (TX), Formosa Plastics Corporation Texas
Property Owner: Calhoun County Clerk's Office (TX)
$32,714
Source: Levelset Data
Companies
In this section, you can find all 137 known companies who have worked on projects at this address at each level. You'll be able to browse companies, find the information you need to get paid, or search for your next project partner.