On this project at 12630 Water Works Way, Humble, TX 77396 there have been 58 permits filed, 17 preliminary notices exchanged, 26 lien waivers exchanged between companies and 2 liens filed. Below you can find when the various project and payment events occurred over the last several years of data where available. You can also report a payment event if you’re on this project.
58
PERMITS FILED
17
PRELIMINARY NOTICES
26
LIEN WAIVERS
2
LIEN HISTORY
10/15/2024
Slow Payment Reported Against Plw Waterworks
Over $5,000
Source: Levelset Data
10/15/2024
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $10,000
Source: Levelset Data
10/15/2024
Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks
Over $10,000
Source: Levelset Data
10/15/2024
Slow Payment Reported Against Balfour Beatty, KIT Professionals, Inc., Kilgore Industries, Northeast Water Purification Plant Expansion
Over $60,000
Source: Levelset Data
09/26/2024
Lien threat sent to McCarthy Building Companies
Over $1,000
Source: Levelset Data
09/13/2024
Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks
Over $60,000
Source: Levelset Data
09/13/2024
Slow Payment Reported Against City of Houston (TX), Plw Waterworks
Over $5,000
Source: Levelset Data
08/15/2024
Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks
Over $10,000
Source: Levelset Data
08/15/2024
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
08/15/2024
Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks
Over $5,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $10,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against BL Technology, Inc.
Over $1,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
07/15/2024
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Less than $1,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
06/14/2024
Slow Payment Reported Against Horizon International Group, TRAVELERS CASUALTY & SURETY CO
Over $5,000
Source: Levelset Data
05/15/2024
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $10,000
Source: Levelset Data
05/15/2024
Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
05/15/2024
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Houston Waterworks Team, J. Simmons Group Inc.
Over $10,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against CDM Smith, Ch2m Hill Enginers, Kilgore Industries, Plw Waterworks
Over $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $1,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against KIT Professionals, Inc., McCarthy Building Companies
Over $5,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
04/15/2024
Slow Payment Reported Against Balfour Beatty, KIT Professionals, Inc., Kilgore Industries, Northeast Water Purification Plant Expansion
Over $10,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against Houston Waterworks Team, J. Simmons Group Inc., SureTec
Over $5,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against CDM Smith, Ch2m Hill Enginers, Kilgore Industries, Plw Waterworks
Over $1,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against J. Simmons Group Inc., McCarthy Building Companies
Over $5,000
Source: Levelset Data
03/15/2024
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $1,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Balfour Beatty Infrastructure, Houston Waterworks Team
Over $60,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against CDM Smith, Ch2m Hill Enginers, Kilgore Industries, Plw Waterworks
Over $10,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against J. Simmons Group Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Houston Waterworks Team, J. Simmons Group Inc.
Over $5,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against KIT Professionals, Inc., McCarthy Building Companies
Over $60,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $5,000
Source: Levelset Data
02/15/2024
Slow Payment Reported Against Fisk Electric Company, Lindsey Electric Co. LP
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Fisk Electric Company, Lindsey Electric Co. LP
Over $1,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $5,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against J. Simmons Group Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Balfour Beatty, KIT Professionals, Inc., Kilgore Industries, Northeast Water Purification Plant Expansion
Over $10,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
01/12/2024
Slow Payment Reported Against CDM Smith, Ch2m Hill Enginers, Kilgore Industries, Northeast Water Purification Plant Expansion, Plw Waterworks
Over $10,000
Source: Levelset Data
01/12/2024
Lien filed by Ferguson Enterprises, LLC | Claimant directly hired by GC
Lien filed against Fidelity And Deposit Company, Houston Waterworks Team
GC listed on lien: Houston Waterworks Team
Property Owner: City of Houston (TX)
$47,124
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Balfour Beatty, KIT Professionals, Inc., Kilgore Industries, Northeast Water Purification Plant Expansion
Over $60,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against J. Simmons Group Inc., McCarthy Building Companies
Over $1,000
Source: Levelset Data
12/15/2023
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
12/11/2023
Lien threat sent to Fidelity And Deposit Company, Houston Waterworks Team
Over $10,000
Source: Levelset Data
11/15/2023
Slow Payment Reported Against Industrial Texas Corporation
Over $1,000
Source: Levelset Data
11/15/2023
Slow Payment Reported Against J. Simmons Group Inc., McCarthy Building Companies
Over $1,000
Source: Levelset Data
11/15/2023
Slow Payment Reported Against KIT Professionals, Inc., McCarthy Building Companies
Over $60,000
Source: Levelset Data
11/15/2023
Slow Payment Reported Against Balfour Beatty, KIT Professionals, Inc., Kilgore Industries, Northeast Water Purification Plant Expansion
Over $60,000
Source: Levelset Data
11/15/2023
Slow Payment Reported Against Plw Waterworks
Over $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against KIT Professionals, Inc.
Over $10,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Less than $1,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Balfour Beatty, KIT Professionals, Inc., Kilgore Industries, Northeast Water Purification Plant Expansion
Over $60,000
Source: Levelset Data
10/13/2023
Slow Payment Reported Against Fidelity And Deposit Company
Over $10,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries, Libery Mutual
Over $1,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against KIT Professionals, Inc.
Over $1,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against J. Simmons Group Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
09/15/2023
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries, Libery Mutual
Over $1,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $1,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $5,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
08/15/2023
Slow Payment Reported Against American Home Assurance Company, CHUBB GROUP OF INSURANCE COMPA, Federal Insurance Company (a Chubb Company), Great American Insurance Company, Plw Waterworks, TRAVELERS CASUALTY & SURETY COMPANY OF AMERICA, The Continental Insurance Company
Over $5,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Plw Waterworks
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Horizon International Group, KIT Professionals, Inc.
Over $60,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, TRAVELERS CASUALTY & SURETY CO, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against American Home Assurance Company, CHUBB GROUP OF INSURANCE COMPA, Federal Insurance Company (a Chubb Company), Great American Insurance Company, Plw Waterworks, TRAVELERS CASUALTY & SURETY COMPANY OF AMERICA, The Continental Insurance Company
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
07/14/2023
Slow Payment Reported Against J. Simmons Group Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Houston Waterworks Team, KIT Professionals, Inc.
Over $60,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Plw Waterworks
Over $10,000
Source: Levelset Data
06/15/2023
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
05/15/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
05/15/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
05/15/2023
Slow Payment Reported Against Balfour Beatty, KIT Professionals, Inc., Kilgore Industries, Northeast Water Purification Plant Expansion
Over $1,000
Source: Levelset Data
05/15/2023
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $10,000
Source: Levelset Data
05/15/2023
Slow Payment Reported Against McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
05/15/2023
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against McCarthy Building Companies
Over $10,000
Source: Levelset Data
04/14/2023
Slow Payment Reported Against Balfour Beatty, KIT Professionals, Inc., Kilgore Industries, Northeast Water Purification Plant Expansion
Over $60,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Plw Waterworks
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Horizon International Group, KIT Professionals, Inc.
Over $60,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against McCarthy Building Companies
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Balfour Beatty, KIT Professionals, Inc., Kilgore Industries, Northeast Water Purification Plant Expansion
Over $60,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Houston Waterworks Team
Over $10,000
Source: Levelset Data
03/15/2023
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against McCarthy Building Companies
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $5,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $5,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against City of Houston (TX), Houston Waterworks Team, KIT Professionals, Inc.
Over $5,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion
Over $60,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against City of Houston (TX), Houston Waterworks Team, KIT Professionals, Inc.
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Houston Waterworks Team
Over $1,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
02/15/2023
Slow Payment Reported Against Plw Waterworks
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $1,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Fisk Electric Company, Northeast Water Purification Plant Expansion
Over $5,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against City of Houston (TX), Fisk Electric Company
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Plw Waterworks
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Houston Waterworks Team
Over $5,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, TRAVELERS CASUALTY & SURETY CO, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Horizon International Group, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
01/13/2023
Slow Payment Reported Against Horizon International Group
Over $10,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against Plw Waterworks
Over $5,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against Houston Waterworks Team
Over $10,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against American Home Assurance Company, Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Fidelity And Deposit Company of Maryland, Liberty Mutual Insurance Company, Plw Waterworks, The Continental Insurance Company
Over $5,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, TRAVELERS CASUALTY & SURETY CO, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against Fisk Electric Company
Over $10,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against Kilgore Industries, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against Houston Waterworks Team, J. Simmons Group Inc., Northeast Water Purification Plant Expansion
Over $10,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against McCarthy Building Companies
Over $1,000
Source: Levelset Data
12/15/2022
Slow Payment Reported Against Ch2m Hill Enginers, Kilgore Industries
Over $1,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Plw Waterworks
Over $5,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $1,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Kilgore Mechanical, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Kilgore Industries, Northeast Water Purification Plant Expansion
Over $60,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Houston Waterworks Team, J. Simmons Group Inc., Northeast Water Purification Plant Expansion
Over $10,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $1,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Slack & Co Contracting Inc
Over $1,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Kilgore Industries
Over $1,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
11/15/2022
Slow Payment Reported Against Fisk Electric Company, Northeast Water Purification Plant Expansion
Over $10,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against Houston Waterworks Team
Over $10,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $5,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against Kilgore Industries
Over $10,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against Plw Waterworks
Over $5,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against Kilgore Mechanical, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against American Home Assurance Company, Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Fidelity And Deposit Company of Maryland, Liberty Mutual Insurance Company, Plw Waterworks, The Continental Insurance Company
Over $5,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $5,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $10,000
Source: Levelset Data
10/14/2022
Slow Payment Reported Against Fidelity And Deposit Company
Over $60,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Slack & Co Contracting Inc
Over $10,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against McCarthy Building Companies
Over $10,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Fidelity And Deposit Company, Fidelity And Deposit Company Bond 47sur300043010017, Houston Waterworks Team, Texcon Ready Mix
Less than $1,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $5,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $5,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Plw Waterworks
Over $5,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Kilgore Industries
Over $10,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Fidelity And Deposit Company
Over $60,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Kilgore Mechanical, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Houston Waterworks Team, J. Simmons Group Inc., Northeast Water Purification Plant Expansion
Over $1,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $10,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against City of Houston (TX), Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
09/15/2022
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
09/14/2022
Slow Payment Reported Against City of Houston (TX), Slack & Co Contracting Inc
Over $10,000
Source: Levelset Data
08/17/2022
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
08/15/2022
Slow Payment Reported Against Kilgore Mechanical, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
08/15/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
08/15/2022
Slow Payment Reported Against American Home Assurance Company, Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Fidelity And Deposit Company of Maryland, Liberty Mutual Insurance Company, Plw Waterworks, The Continental Insurance Company
Over $5,000
Source: Levelset Data
08/15/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
08/15/2022
Slow Payment Reported Against Houston Waterworks Team, J. Simmons Group Inc., Northeast Water Purification Plant Expansion
Over $10,000
Source: Levelset Data
08/15/2022
Slow Payment Reported Against Competitive Choice, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Kilgore Industries
Over $60,000
Source: Levelset Data
08/15/2022
Slow Payment Reported Against Fidelity And Deposit Company
Over $60,000
Source: Levelset Data
08/15/2022
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Kilgore Mechanical, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $5,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Competitive Choice, Houston Waterworks Team
Over $60,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Competitive Choice, Federal Insurance Company (a Chubb Company), Houston Waterworks Team
Over $60,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $5,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Houston Waterworks Team
Over $5,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against City of Houston (TX), Gardner Denver
Over $10,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Camarata Masonry Systems LTD
Over $1,000
Source: Levelset Data
07/15/2022
Slow Payment Reported Against Seibert Enterprises dba FSR Services, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Balfour Beatty, Gralan Enterprises, Inc., McCarthy Building Companies
Over $5,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Competitive Choice, Federal Insurance Company (a Chubb Company), Houston Waterworks Team
Over $60,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Competitive Choice, Houston Waterworks Team
Over $60,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $1,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against City of Houston (TX), Edh Plumbing Contractors, Horizon International Group, TRAVELERS CASUALTY & SURETY CO
Less than $1,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Kilgore Mechanical, Pepper-Lawson Waterworks LLC dba PLW Waterworks, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Kilgore Industries
Over $10,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Houston Waterworks Team
Over $60,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $5,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $10,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
06/15/2022
Slow Payment Reported Against Reytec Construction Resources Inc
Over $5,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against City of Houston (TX), Reytec Construction Resources Inc
Over $10,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Kilgore Industries
Over $10,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $10,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Competitive Choice, Houston Waterworks Team
Over $60,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Houston Waterworks Team
Over $60,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against City of Houston (TX), McCarthy Building Companies
Over $60,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Reytec Construction Resources Inc
Over $10,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Houston Waterworks Team
Over $60,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against City of Houston (TX), Edh Plumbing Contractors, Horizon International Group, TRAVELERS CASUALTY & SURETY CO
Less than $1,000
Source: Levelset Data
05/13/2022
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $10,000
Source: Levelset Data
05/04/2022
Source: ConstructionMonitor
04/15/2022
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $10,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against American Home Assurance Company, Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Fidelity And Deposit Company of Maryland, Liberty Mutual Insurance Company, Plw Waterworks, The Continental Insurance Company
Over $10,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Houston Waterworks Team
Over $60,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Competitive Choice, Houston Waterworks Team
Over $10,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $10,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Houston Waterworks Team
Over $5,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Plw Waterworks
Over $10,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Kilgore Mechanical, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Houston Waterworks Team
Over $60,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $10,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
04/15/2022
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $1,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against C & B Waterworks, Houston Waterworks Team
Over $60,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $10,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $10,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against City of Houston (TX), McCarthy Building Companies
Over $60,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Alberici Constructors, Inc., City of Houston (TX), Kilgore Industries
Over $10,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Competitive Choice, Houston Waterworks Team
Over $10,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Plw Waterworks
Over $10,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Houston Waterworks Team
Over $60,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Houston Waterworks Team
Over $60,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against Kilgore Mechanical, Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against City of Houston (TX), Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $10,000
Source: Levelset Data
03/15/2022
Slow Payment Reported Against City of Houston (TX), Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Libery Mutual, McCarthy Building Companies
Over $1,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against American Home Assurance Company, Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Fidelity And Deposit Company of Maryland, Liberty Mutual Insurance Company, Plw Waterworks, The Continental Insurance Company
Over $10,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $10,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $10,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Fidelity And Deposit Company of Maryland, Houston Waterworks Team, Industrial TX Corporation, The Hanover Insurance Company
Less than $1,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Seibert Enterprises dba FSR Services, Webber LLC (a Ferrovial Company)
Over $1,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Kilgore Industries
Over $5,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Houston Waterworks Team
Over $60,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Houston Waterworks Team
Over $60,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against City of Houston (TX), Edh Plumbing Contractors, Horizon International Group, TRAVELERS CASUALTY & SURETY CO
Over $5,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $5,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Kilgore Mechanical, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Alberici Constructors, Inc., Houston Waterworks Team, Kilgore Industries, TRAVELERS CASUALTY & SURETY CO
Less than $1,000
Source: Levelset Data
02/15/2022
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Houston Waterworks Team
Over $60,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Houston Waterworks Team
Over $60,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against American Home Assurance Company, Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Fidelity And Deposit Company of Maryland, Liberty Mutual Insurance Company, Plw Waterworks, The Continental Insurance Company
Over $5,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Plw Waterworks
Over $5,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $10,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Kilgore Industries
Over $10,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Alberici Constructors, Inc., Houston Waterworks Team, Kilgore Industries, TRAVELERS CASUALTY & SURETY CO
Less than $1,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against Kilgore Mechanical, Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
01/14/2022
Slow Payment Reported Against CDM CONSTRUCTORS
Over $10,000
Source: Levelset Data
12/16/2021
Slow Payment Reported Against Kilgore Industries
Over $10,000
Source: Levelset Data
12/16/2021
Slow Payment Reported Against Alberici Corporation, Kilgore Industries
Over $5,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $5,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $5,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Alberici Constructors, Inc., Houston Waterworks Team, Kilgore Industries
Less than $1,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Houston Waterworks Team
Over $10,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against American Home Assurance Company, Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Fidelity And Deposit Company of Maryland, Liberty Mutual Insurance Company, Plw Waterworks, The Continental Insurance Company
Over $5,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Plw Waterworks
Over $5,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties
Over $60,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against Competitive Choice, Houston Waterworks Team
Over $10,000
Source: Levelset Data
12/15/2021
Slow Payment Reported Against City of Houston (TX), Kilgore Industries
Over $10,000
Source: Levelset Data
12/14/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Kilgore Industries
Over $10,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against McCarthy Building Companies, Pyramid Masonry And Construction
Over $10,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties
Over $60,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $5,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Alberici Corporation, Kilgore Industries
Over $10,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Balfour Beatty, CDM CONSTRUCTORS, Chesapeake Mechanical, Horizon International Group, Lazer Construction Company Inc, McCarthy Building Companies
Over $10,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Kilgore Industries
Over $10,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Fidelity And Deposit Company
Over $1,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Chesapeake Mechanical
Over $10,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Competitive Choice
Over $1,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $5,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Balfour Beatty, TRAVELERS CASUALTY & SURETY CO
Over $60,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Plw Waterworks
Over $5,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
11/15/2021
Slow Payment Reported Against McCarthy Building Companies
Over $10,000
Source: Levelset Data
11/12/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
11/12/2021
Lien threat sent to Balfour Beatty, Houston Waterworks Team, Travelers Bond Claims
Over $5,000
Source: Levelset Data
10/28/2021
Contractors listed on Permit: Northeast Water Purification Plant Expansion
# 2104290114-SITE-001
$3,500,000
Source: ConstructionMonitor
10/15/2021
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Balfour Beatty
Over $10,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against McCarthy Building Companies, Pyramid Masonry And Construction
Over $10,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Chesapeake Mechanical
Over $10,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Alberici Constructors, Inc., Houston Waterworks Team, Kilgore Industries
Over $1,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Balfour Beatty, CDM CONSTRUCTORS, Chesapeake Mechanical, Horizon International Group, Lazer Construction Company Inc, McCarthy Building Companies
Over $10,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $10,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Kilgore Industries
Over $10,000
Source: Levelset Data
10/15/2021
Slow Payment Reported Against Alberici Corporation, Kilgore Industries
Over $10,000
Source: Levelset Data
10/14/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Hwt, McCarthy Building Companies
Over $10,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $5,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against City of Houston (TX), Horizon International Group, Houston Waterworks Team, Texcon Ready Mix
Over $1,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $10,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Balfour Beatty, CDM CONSTRUCTORS, Chesapeake Mechanical, Horizon International Group, Lazer Construction Company Inc, McCarthy Building Companies
Over $10,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Chesapeake Mechanical
Over $10,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
09/15/2021
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $10,000
Source: Levelset Data
08/16/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Gutier LLC
Over $1,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $5,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Balfour Beatty Infrastructure
Over $60,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Alberici Constructors, Inc., Houston Waterworks Team, Kilgore Industries
Over $5,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Balfour Beatty, CDM CONSTRUCTORS, Chesapeake Mechanical, Horizon International Group, Lazer Construction Company Inc, McCarthy Building Companies
Over $10,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries, TRAVELERS CASUALTY & SURETY CO
Over $5,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Webber LLC (a Ferrovial Company)
Over $10,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Alberici Corporation, Kilgore Industries
Over $10,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against C & B Waterworks, Houston Waterworks Team
Over $60,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Gutier LLC, McCarthy Building Companies
Over $10,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
08/13/2021
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/19/2021
Source: ConstructionMonitor
07/15/2021
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Fidelity And Deposit Company
Over $5,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against McCarthy Building Companies
Over $60,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against City of Houston (TX), Fidelity And Deposit Company Bond 47sur300043010017, Horizon International Group, Houston Waterworks Team, Texcon Ready Mix
Over $1,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $1,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Alberici Corporation, Kilgore Industries
Over $10,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
07/15/2021
Slow Payment Reported Against Gutier LLC, McCarthy Building Companies
Over $10,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Gutier LLC, McCarthy Building Companies
Over $10,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against City of Houston (TX), Federal Insurance Company (a Chubb Company), Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $5,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against CDM CONSTRUCTORS
Over $60,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Houston Waterworks Team, McCarthy Building Companies
Over $60,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Alberici Constructors, Inc., Competitive Choice, Houston Waterworks Team, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Balfour Beatty
Over $1,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Horizon International Group, Texcon Ready Mix
Over $1,000
Source: Levelset Data
06/15/2021
Slow Payment Reported Against Alberici Corporation, City of Houston (TX), Kilgore Industries
Over $10,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Alberici Constructors, Inc., Competitive Choice
Over $10,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $10,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Federal Insurance Company (a Chubb Company)
Over $60,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Alberici Corporation, Kilgore Industries
Over $10,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Gutier LLC, McCarthy Building Companies
Over $10,000
Source: Levelset Data
05/14/2021
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $60,000
Source: Levelset Data
04/26/2021
Source: ConstructionMonitor
04/26/2021
Source: ConstructionMonitor
04/26/2021
Source: ConstructionMonitor
04/26/2021
Source: ConstructionMonitor
04/26/2021
Source: ConstructionMonitor
04/26/2021
Source: ConstructionMonitor
04/26/2021
Source: ConstructionMonitor
04/15/2021
Slow Payment Reported Against Kilgore Industries, Plw Waterworks
Over $10,000
Source: Levelset Data
04/15/2021
Slow Payment Reported Against Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
04/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
04/15/2021
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Less than $1,000
Source: Levelset Data
04/15/2021
Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Industrial TX Corporation
Over $10,000
Source: Levelset Data
04/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
03/15/2021
Slow Payment Reported Against Houston Waterworks Team, Industrial TX Corporation
Over $10,000
Source: Levelset Data
03/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
03/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
03/15/2021
Slow Payment Reported Against Webber LLC (a Ferrovial Company)
Over $60,000
Source: Levelset Data
03/15/2021
Slow Payment Reported Against Industrial TX Corporation
Over $10,000
Source: Levelset Data
03/15/2021
Slow Payment Reported Against Alberici Constructors, Inc., Competitive Choice
Over $10,000
Source: Levelset Data
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Permit Description
Above Ground Storage Tanks
Source: ConstructionMonitor
03/11/2021
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
03/11/2021
Permit Description
Above Ground Storage Tanks
Source: ConstructionMonitor
03/11/2021
Permit Description
Above Ground Storage Tanks
Source: ConstructionMonitor
02/23/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Alberici Constructors, Inc., Competitive Choice
Over $10,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $10,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against City of Houston (TX), Gralan Enterprises, Inc., McCarthy Building Companies, TRAVELERS CASUALTY & SURETY CO
Over $10,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
02/12/2021
Slow Payment Reported Against Fidelity And Deposit Company
Over $60,000
Source: Levelset Data
01/19/2021
Permit Description
Industrial Building
Source: ConstructionMonitor
01/19/2021
Permit Description
Above Ground Storage Tanks
Source: ConstructionMonitor
01/19/2021
Permit Description
Industrial Building
Source: ConstructionMonitor
01/19/2021
Permit Description
Industrial Building
Source: ConstructionMonitor
01/19/2021
Permit Description
Water Purification Plant
Source: ConstructionMonitor
01/19/2021
Permit Description
Above Ground Storage Tanks
Source: ConstructionMonitor
01/15/2021
Slow Payment Reported Against Alberici Constructors, Inc., Kilgore Industries
Over $10,000
Source: Levelset Data
01/15/2021
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
01/15/2021
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
01/15/2021
Slow Payment Reported Against McCarthy Building Companies, Pyramid Masonry And Construction
Over $5,000
Source: Levelset Data
12/29/2020
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
12/29/2020
Permit Description
Industrial Building
Source: ConstructionMonitor
12/15/2020
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
12/15/2020
Slow Payment Reported Against McCarthy Building Companies, Pyramid Masonry And Construction
Over $1,000
Source: Levelset Data
12/15/2020
Slow Payment Reported Against J. Simmons Group Inc.
Over $10,000
Source: Levelset Data
12/15/2020
Slow Payment Reported Against Balfour Beatty, Bamex Painting, McCarthy Building Companies
Over $1,000
Source: Levelset Data
11/13/2020
Slow Payment Reported Against CDM CONSTRUCTORS
Over $60,000
Source: Levelset Data
11/13/2020
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
11/13/2020
Slow Payment Reported Against McCarthy Building Companies, Pyramid Masonry And Construction
Over $1,000
Source: Levelset Data
10/23/2020
Slow Payment Reported Against Balfour Beatty, Houston Waterworks Team
Over $60,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Horizon International Group, Slab Strategies
Over $10,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against CDM CONSTRUCTORS
Over $60,000
Source: Levelset Data
10/15/2020
Slow Payment Reported Against Houston Waterworks Team, Wharton-Smith, Inc.
Over $5,000
Source: Levelset Data
10/01/2020
Permit Description
Office Building
Source: ConstructionMonitor
09/15/2020
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
09/15/2020
Slow Payment Reported Against Houston Waterworks Team, Wharton-Smith, Inc.
Over $5,000
Source: Levelset Data
09/15/2020
Slow Payment Reported Against City of Houston (TX), Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
09/14/2020
Permit Description
Water Purification Plant
Source: ConstructionMonitor
09/14/2020
Permit Description
Water Purification Plant
Source: ConstructionMonitor
08/28/2020
Permit Description
Commercial Structure
Source: ConstructionMonitor
08/17/2020
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
08/14/2020
Slow Payment Reported Against Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
07/15/2020
Slow Payment Reported Against City of Houston (TX), Gralan Enterprises, Inc., McCarthy Building Companies
Over $10,000
Source: Levelset Data
07/15/2020
Slow Payment Reported Against Balfour Beatty Infrastructure, Houston Waterworks Team
Over $1,000
Source: Levelset Data
06/19/2020
Permit Description
Expansion Of Water Purification Plant
Source: ConstructionMonitor
06/19/2020
Permit Description
Expansion Of Water Purification Plant
Source: ConstructionMonitor
06/15/2020
Slow Payment Reported Against Houston Waterworks Team, Wharton-Smith, Inc.
Over $10,000
Source: Levelset Data
05/13/2020
Permit Description
Water Plant Expansion
Source: ConstructionMonitor
04/06/2020
Permit Description
Water Purification Plant Expansion
Source: ConstructionMonitor
02/14/2020
Slow Payment Reported Against Balfour Beatty Infrastructure
Over $5,000
Source: Levelset Data
02/14/2020
Slow Payment Reported Against Barnard Construction-US, Drill Tech Drilling & Shoring, Inc., Fidelity And Deposit Company of Maryland
Over $5,000
Source: Levelset Data
02/06/2020
Lien threat sent to Barnard Construction-US, City of Houston (TX), Drill Tech Drilling & Shoring, Inc.
Over $5,000
Source: Levelset Data
01/15/2020
Slow Payment Reported Against City of Houston (TX), Houston Waterworks Team, Wharton-Smith, Inc.
Over $10,000
Source: Levelset Data
01/15/2020
Slow Payment Reported Against Barnard Construction-US, Drill Tech Drilling & Shoring, Inc.
Over $5,000
Source: Levelset Data
01/15/2020
Slow Payment Reported Against Balfour Beatty Infrastructure, City of Houston (TX)
Over $5,000
Source: Levelset Data
01/15/2020
Slow Payment Reported Against Balfour Beatty Infrastructure
Over $5,000
Source: Levelset Data
12/20/2019
Slow Payment Reported Against City of Houston (TX), J. Simmons Group Inc.
Over $60,000
Source: Levelset Data
12/13/2019
Slow Payment Reported Against Barnard Construction-US, Drill Tech Drilling & Shoring, Inc.
Over $10,000
Source: Levelset Data
11/15/2019
Slow Payment Reported Against Barnard Construction-US, Drill Tech Drilling & Shoring, Inc.
Over $10,000
Source: Levelset Data
10/15/2019
Slow Payment Reported Against Barnard Construction-US, Drill Tech Drilling & Shoring, Inc.
Over $5,000
Source: Levelset Data
09/13/2019
Slow Payment Reported Against Barnard Construction-US, Drill Tech Drilling & Shoring, Inc.
Over $5,000
Source: Levelset Data
08/15/2019
Slow Payment Reported Against Barnard Construction-US, Drill Tech Drilling & Shoring, Inc.
Over $10,000
Source: Levelset Data
07/15/2019
Slow Payment Reported Against Apcon Services LLC (Conroe, TX), Lazer Construction Company Inc
Over $1,000
Source: Levelset Data
07/15/2019
Slow Payment Reported Against Barnard Construction-US, Drill Tech Drilling & Shoring, Inc.
Over $10,000
Source: Levelset Data
06/14/2019
Slow Payment Reported Against Lazer Construction Company Inc, The Guarantee Company of North America
Over $5,000
Source: Levelset Data
06/13/2019
Lien filed by Lhoist North America | Claimant directly hired by GC
Lien filed against City of Houston (TX), Lazer Construction Company Inc, The Guarantee Company of North America
GC listed on lien: Lazer Construction Company Inc
Property Owner: City of Houston (TX)
$16,746
Source: Levelset Data
05/15/2019
Slow Payment Reported Against Lazer Construction Company Inc
Over $10,000
Source: Levelset Data
04/15/2019
Slow Payment Reported Against Lazer Construction Company Inc
Over $10,000
Source: Levelset Data
12/14/2018
Slow Payment Reported Against McCarthy Building Companies, The Hanover Insurance Company
Over $10,000
Source: Levelset Data
11/15/2018
Slow Payment Reported Against Lazer Construction Company Inc
Over $10,000
Source: Levelset Data
10/16/2018
Slow Payment Reported Against CDM Smith, Lazer Construction Company Inc
Less than $1,000
Source: Levelset Data
10/15/2018
Slow Payment Reported Against Industrial TX Corporation, McCarthy Building Companies, The Hanover Insurance Company
Over $1,000
Source: Levelset Data
10/15/2018
Slow Payment Reported Against Lazer Construction Company Inc
Over $10,000
Source: Levelset Data
09/14/2018
Slow Payment Reported Against Industrial TX Corporation, McCarthy Building Companies
Over $1,000
Source: Levelset Data
09/14/2018
Slow Payment Reported Against Lazer Construction Company Inc
Over $10,000
Source: Levelset Data
08/15/2018
Slow Payment Reported Against Lazer Construction Company Inc
Over $10,000
Source: Levelset Data
07/14/2018
Slow Payment Reported Against Emerald Standard Services, Mcdonald Brady C Mcdonald Michelle C
Less than $1,000
Source: Levelset Data
07/14/2018
Slow Payment Reported Against Emerald Standard Services
Less than $1,000
Source: Levelset Data
Companies
In this section, you can find all 72 known companies who have worked on projects at this address at each level. You'll be able to browse companies, find the information you need to get paid, or search for your next project partner.
Levelset will pay for your materials.
You pay us back up to 120 days later.
Apply Now