  • Last known event: 12/18/2024
  • First known event: 08/16/2018
LevelsetProjectsTexasHumble12550 Water Works Way

Property Details


PROJECT TYPE

Commercial

PROPERTY OWNER

City of Houston (TX)

CITY

Humble

Key Facts

The project located at 12550 Water Works Way, Humble, Texas 77396 has had 51 companies do work over the last 7 years.

Lien History

There has been 3 liens at this address with a reported total value of $669,925.13.

Project History


On this project at 12550 Water Works Way, Humble, TX 77396 there have been 2 permits filed, 9 preliminary notices exchanged, 119 lien waivers exchanged between companies and 3 liens filed. Below you can find when the various project and payment events occurred over the last several years of data where available. You can also report a payment event if you’re on this project.

Overview

2

PERMITS FILED

9

PRELIMINARY NOTICES

119

LIEN WAIVERS

3

LIEN HISTORY

Payment Timeline

12/13/2024

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $10,000


Source: Levelset Data

11/15/2024

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

11/15/2024

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $10,000


Source: Levelset Data

09/13/2024

Slow Payment Reported


Source: Levelset Data

09/13/2024

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

08/15/2024

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

08/15/2024

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $5,000


Source: Levelset Data

07/15/2024

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $5,000


Source: Levelset Data

05/15/2024

Slow Payment Reported

Slow Payment Reported Against Colonial American Casualty, Fidelity And Deposit Company of Maryland, HCL Mechanical Services, McCarthy Painting Co., Zurich Surety

Over $5,000


Source: Levelset Data

05/15/2024

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

04/15/2024

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Painting Co.

Over $5,000


Source: Levelset Data

02/29/2024

Mechanics Lien Filed

Lien filed by Steeltech

Lien filed against Balfour Beatty Infrastructure, The Hanover Insurance Company

Property Owner: West Harris County Regional Water Authority (TX)

$262,851


Source: Levelset Data

02/22/2024

Mechanics Lien Filed

Lien filed by Steeltech

Lien filed against Balfour Beatty Infrastructure, The Hanover Insurance Company

Property Owner: West Harris County Regional Water Authority (TX)

$113,001


Source: Levelset Data

02/15/2024

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

01/18/2024

Lien Threatened

Lien threat sent to Balfour Beatty, Spartan Reinforcing LLC dba Spartan Group, The Hanover Insurance Company

Less than $1,000


Source: Levelset Data

01/12/2024

Mechanics Lien Filed

Lien filed by Steeltech

Lien filed against Balfour Beatty Infrastructure

Property Owner: West Harris County Regional Water Authority (TX)

$6,241


Source: Levelset Data

01/12/2024

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty Infrastructure, Spartan Reinforcing LLC dba Spartan Group, The Hanover Insurance Company

Over $5,000


Source: Levelset Data

01/12/2024

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty Infrastructure, Spartan Reinforcing LLC dba Spartan Group, The Hanover Insurance Company

Over $10,000


Source: Levelset Data

01/12/2024

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty Infrastructure, Spartan Reinforcing LLC dba Spartan Group, The Hanover Insurance Company

Over $60,000


Source: Levelset Data

12/20/2023

Lien Threatened

Lien threat sent to Balfour Beatty Infrastructure, Spartan Reinforcing LLC dba Spartan Group, The Hanover Insurance Company

Over $60,000


Source: Levelset Data

12/15/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty Infrastructure, Spartan Reinforcing LLC dba Spartan Group, The Hanover Insurance Company

Over $60,000


Source: Levelset Data

12/15/2023

Slow Payment Reported


Source: Levelset Data

12/15/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Less than $1,000


Source: Levelset Data

12/15/2023

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Houston Waterworks Team, Liberty Mutual Insurance Company, Reytec Construction Resources Inc, TRAVELERS CASUALTY & SURETY COMPANY OF AMERICA

Over $5,000


Source: Levelset Data

12/15/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Kilgore Industries

Over $5,000


Source: Levelset Data

11/20/2023

Lien Threatened

Lien threat sent to Balfour Beatty Infrastructure, Spartan Reinforcing LLC dba Spartan Group, The Hanover Insurance Company

Over $60,000


Source: Levelset Data

11/15/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

11/15/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $1,000


Source: Levelset Data

11/15/2023

Slow Payment Reported


Source: Levelset Data

11/15/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty Infrastructure, Spartan Reinforcing LLC dba Spartan Group, The Hanover Insurance Company

Over $60,000


Source: Levelset Data

10/26/2023

Lien Threatened


Source: Levelset Data

10/13/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $1,000


Source: Levelset Data

10/13/2023

Slow Payment Reported


Source: Levelset Data

10/13/2023

Slow Payment Reported

Slow Payment Reported Against Brown & Root Industrial Services, Industrial TX Corporation, The Hanover Insurance Company

Over $10,000


Source: Levelset Data

10/13/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

10/13/2023

Slow Payment Reported

Slow Payment Reported Against Brown & Root Industrial Services, City of Houston (TX), Industrial TX Corporation, The Hanover Insurance Company

Over $10,000


Source: Levelset Data

09/21/2023

Lien Threatened


Source: Levelset Data

09/15/2023

Slow Payment Reported

Slow Payment Reported Against Brown & Root Industrial Services, Industrial TX Corporation

Over $10,000


Source: Levelset Data

09/15/2023

Slow Payment Reported

Slow Payment Reported Against Brown & Root Industrial Services, Industrial TX Corporation, The Hanover Insurance Company

Over $10,000


Source: Levelset Data

09/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Painting Co.

Over $10,000


Source: Levelset Data

09/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

09/15/2023

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services, McCarthy Painting Co.

Over $10,000


Source: Levelset Data

08/24/2023

Lien Threatened


Source: Levelset Data

08/24/2023

Lien Threatened


Source: Levelset Data

08/15/2023

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services, McCarthy Painting Co.

Over $10,000


Source: Levelset Data

08/15/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $1,000


Source: Levelset Data

08/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Painting Co.

Over $10,000


Source: Levelset Data

08/15/2023

Slow Payment Reported

Slow Payment Reported Against Brown & Root Industrial Services, Industrial TX Corporation

Over $10,000


Source: Levelset Data

08/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

07/24/2023

Lien Threatened

Lien threat sent to Spartan Reinforcing LLC dba Spartan Group

Over $60,000


Source: Levelset Data

07/24/2023

Lien Threatened


Source: Levelset Data

07/14/2023

Slow Payment Reported


Source: Levelset Data

07/14/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $5,000


Source: Levelset Data

07/14/2023

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Houston Waterworks Team, Liberty Mutual Insurance Company, Reytec Construction Resources Inc, TRAVELERS CASUALTY & SURETY COMPANY OF AMERICA

Over $1,000


Source: Levelset Data

07/14/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $1,000


Source: Levelset Data

07/14/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Painting Co.

Over $10,000


Source: Levelset Data

07/14/2023

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services, McCarthy Painting Co.

Over $10,000


Source: Levelset Data

07/14/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

06/27/2023

Lien Threatened


Source: Levelset Data

06/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

06/15/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

06/15/2023

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services, McCarthy Painting Co.

Over $10,000


Source: Levelset Data

06/15/2023

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Houston Waterworks Team, Liberty Mutual Insurance Company, Reytec Construction Resources Inc, TRAVELERS CASUALTY & SURETY COMPANY OF AMERICA

Over $5,000


Source: Levelset Data

06/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Painting Co.

Over $10,000


Source: Levelset Data

06/15/2023

Slow Payment Reported


Source: Levelset Data

06/15/2023

Slow Payment Reported


Source: Levelset Data

05/24/2023

Lien Threatened


Source: Levelset Data

05/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Painting Co.

Over $10,000


Source: Levelset Data

05/15/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

05/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

05/15/2023

Slow Payment Reported


Source: Levelset Data

05/15/2023

Slow Payment Reported


Source: Levelset Data

05/11/2023

Lien Threatened

Lien threat sent to Cook Mechanical, Horizon International Group, TRAVELERS CASUALTY & SURETY CO

Over $10,000


Source: Levelset Data

04/25/2023

Lien Threatened


Source: Levelset Data

04/25/2023

Lien Threatened

Lien threat sent to Spartan Reinforcing LLC dba Spartan Group

Over $10,000


Source: Levelset Data

04/14/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

04/14/2023

Slow Payment Reported


Source: Levelset Data

04/14/2023

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group, TRAVELERS CASUALTY & SURETY CO

Over $5,000


Source: Levelset Data

03/17/2023

Lien Threatened

Lien threat sent to Spartan Reinforcing LLC dba Spartan Group

Over $60,000


Source: Levelset Data

03/15/2023

Slow Payment Reported

Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Kilgore Industries, TRAVELERS CASUALTY & SURETY CO

Less than $1,000


Source: Levelset Data

03/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

03/15/2023

Slow Payment Reported


Source: Levelset Data

03/15/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $1,000


Source: Levelset Data

03/15/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

03/15/2023

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group

Over $5,000


Source: Levelset Data

02/17/2023

Lien Threatened

Lien threat sent to Spartan Reinforcing LLC dba Spartan Group

Over $60,000


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $5,000


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Houston Waterworks Team, Reytec Construction Resources Inc

Less than $1,000


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Houston Waterworks Team, Liberty Mutual Insurance Company, Reytec Construction Resources Inc, TRAVELERS CASUALTY & SURETY COMPANY OF AMERICA

Less than $1,000


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

02/15/2023

Slow Payment Reported


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Kilgore Industries

Over $1,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $5,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

01/13/2023

Slow Payment Reported


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

12/15/2022

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Kilgore Industries, Northeast Water Purification Plant Expansion

Over $10,000


Source: Levelset Data

12/15/2022

Slow Payment Reported


Source: Levelset Data

12/15/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

11/28/2022

Permit Filed

Permit Approved 

Contractors listed on Permit: Segment C Butterfly Valve, City of Houston (TX)

# 2209060047-SITE-001

$200,000


Source: ConstructionMonitor

11/15/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Kilgore Industries, Kilgore Mechanical

Over $5,000


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks

Over $60,000


Source: Levelset Data

11/15/2022

Slow Payment Reported


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against Federal Insurance Company (a Chubb Company), Houston Waterworks Team, Kilgore Industries, Kilgore Mechanical, TRAVELERS CASUALTY & SURETY CO

Over $5,000


Source: Levelset Data

11/03/2022

Lien Threatened

Lien threat sent to Spartan Reinforcing LLC dba Spartan Group

Over $60,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks

Over $60,000


Source: Levelset Data

10/14/2022

Slow Payment Reported


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Kilgore Industries, Kilgore Mechanical

Over $5,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Kilgore Industries, Kilgore Mechanical, TRAVELERS CASUALTY & SURETY CO

Over $5,000


Source: Levelset Data

09/15/2022

Slow Payment Reported


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Plw Waterworks

Over $60,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Kilgore Industries, Kilgore Mechanical

Over $5,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks

Over $60,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

08/17/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks

Over $60,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services

Over $10,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks

Over $60,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Houston Waterworks Team, Reytec Construction Resources Inc

Less than $1,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against McCarthy Building Companies

Over $5,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services

Over $10,000


Source: Levelset Data

06/15/2022

Slow Payment Reported


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Plw Waterworks

Over $60,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against McCarthy Building Companies

Over $10,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services

Over $10,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services

Over $10,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), Houston Waterworks Team, Kilgore Industries, Kilgore Mechanical, TRAVELERS CASUALTY & SURETY CO

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

05/13/2022

Slow Payment Reported


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

05/13/2022

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Kilgore Industries, TRAVELERS CASUALTY & SURETY CO

Over $10,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services

Over $10,000


Source: Levelset Data

04/15/2022

Slow Payment Reported


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Plw Waterworks

Over $60,000


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services

Over $10,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Plw Waterworks

Over $60,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services

Over $10,000


Source: Levelset Data

03/15/2022

Slow Payment Reported


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Philadelphia Indemnity Insurance Company, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), Houston Waterworks Team, Kilgore Industries, Kilgore Mechanical, TRAVELERS CASUALTY & SURETY CO

Less than $1,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Houston Waterworks Team, Liberty Mutual Insurance Company, Reytec Construction Resources Inc

Over $1,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Plw Waterworks

Over $60,000


Source: Levelset Data

01/24/2022

Slow Payment Reported

Slow Payment Reported Against Philadelphia Indemnity Insurance Company, Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against City of Houston (TX), HCL Mechanical Services

Over $10,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Houston Waterworks Team, Reytec Construction Resources Inc

Less than $1,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services

Over $10,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Plw Waterworks

Over $60,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Plw Waterworks

Over $60,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Houston Waterworks Team, Kilgore Industries, Kilgore Mechanical, TRAVELERS CASUALTY & SURETY CO

Less than $1,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

12/15/2021

Slow Payment Reported


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services

Over $10,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group, TRAVELERS CASUALTY & SURETY CO

Over $10,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Bamex Painting, Plw Waterworks

Over $5,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against Berkshire Hathaway HomeServices Utah Properties, Plw Waterworks

Over $60,000


Source: Levelset Data

10/27/2021

Permit Filed

Permit Approved 

Contractors listed on Permit: City of Houston (TX)

# 2110260117-MSD-001

$20,000


Source: ConstructionMonitor

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group, TRAVELERS CASUALTY & SURETY CO

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Webber LLC (a Ferrovial Company)

Over $60,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group, TRAVELERS CASUALTY & SURETY CO

Over $60,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group

Over $60,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Houston Waterworks Team, Reytec Construction Resources Inc

Less than $1,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services, McCarthy Building Companies

Over $10,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against HCL Mechanical Services

Over $10,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Reytec Construction Resources Inc

Less than $1,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Liberty Mutual Insurance Company, Reytec Construction Resources Inc

Less than $1,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group

Over $10,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group

Over $10,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Liberty Mutual Insurance Company, Reytec Construction Resources Inc

Over $1,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Five Companies, LLC, Reytec Construction Resources Inc

Over $1,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against Cook Mechanical, Horizon International Group

Over $10,000


Source: Levelset Data

02/12/2021

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks

Over $60,000


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Cardinal Contractors Inc., Commerce Construction Co.

Over $10,000


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against Alcott, Inc.

Over $5,000


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against Alcott, Inc., Fisk Electric Company

Over $5,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against Balfour Beatty, Cardinal Contractors Inc.

Over $10,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against Alcott, Inc., Fisk Electric Company

Over $5,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against Commerce Construction Co.

Over $10,000


Source: Levelset Data

10/15/2020

Slow Payment Reported

Slow Payment Reported Against Alcott, Inc., Fisk Electric Company

Over $10,000


Source: Levelset Data

10/15/2020

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks, Slack & Co Contracting Inc

Over $5,000


Source: Levelset Data

09/15/2020

Slow Payment Reported

Slow Payment Reported Against Alcott, Inc., Fisk Electric Company, Liberty Mutual Insurance Company

Over $5,000


Source: Levelset Data

09/15/2020

Slow Payment Reported

Slow Payment Reported Against Plw Waterworks, Slack & Co Contracting Inc

Over $5,000


Source: Levelset Data

08/14/2020

Slow Payment Reported

Slow Payment Reported Against Alcott, Inc.

Over $60,000


Source: Levelset Data

07/15/2020

Slow Payment Reported

Slow Payment Reported Against Alcott, Inc.

Over $60,000


Source: Levelset Data

03/13/2020

Slow Payment Reported

Slow Payment Reported Against Slack & Co Contracting Inc

Over $5,000


Source: Levelset Data

12/13/2019

Slow Payment Reported

Slow Payment Reported Against Barnard Construction-US, Plw Waterworks

Over $10,000


Source: Levelset Data

11/15/2019

Slow Payment Reported

Slow Payment Reported Against Barnard Construction-US

Over $10,000


Source: Levelset Data

09/15/2018

Slow Payment Reported

Slow Payment Reported Against Lazer Construction Company Inc, The Guarantee Company of North America

Less than $1,000


Source: Levelset Data

08/16/2018

Slow Payment Reported

Slow Payment Reported Against Lazer Construction Company Inc

Less than $1,000


Source: Levelset Data

Full Project Job Tree51

Companies


In this section, you can find all 51 known companies who have worked on projects at this address at each level. You'll be able to browse companies, find the information you need to get paid, or search for your next project partner.

Lender

Unknown Company

Property Owner

Bonded by Unknown

General Contractor (15)

Bonded by The Guarantee Company of North America
Bonded by The Guarantee Company of North America
Bonded by The Guarantee Company of North America
Bonded by The Guarantee Company of North America
Bonded by The Guarantee Company of North America
Bonded by The Guarantee Company of North America

Subcontractor (28)

Construction Equipment Contractors
Subcontractor

Supplier (7)

101x Valued Repeat Vendor
SP
Sage Pump Services dba Sage Rental Services
MM
Martin Marietta Materials, Inc.
FE
Ferguson Enterprises, LLC
AR
Ahern Rentals, Inc.

Surety Companies (8)

FI
Federal Insurance Company (a Chubb Company)
PI
Philadelphia Indemnity Insurance Company
FA
Fidelity And Deposit Company of Maryland

Job Hierarchy


Lender

Unknown Company

Property Owner

Bonded by Unknown

General Contractor (15)

View All
Bonded by The Guarantee Company of North America

Subcontractor (28)

View All

Supplier (7)

View All
101x Valued Repeat Vendor

Need cash to buy materials for this job?

Levelset will pay for your materials.

You pay us back up to 120 days later.

Apply Now