A map for the project located in Austin, Texas.
Commercial Construction Project at

601 W 2nd St

Austin, TX 78701

  • Last known event: 09/13/2024
  • First known event: 01/22/2020

Property Details


PROJECT TYPE

Commercial

PROPERTY OWNER

Google

CITY

Austin

Key Facts

The project located at 601 W 2nd St, Austin, Texas 78701 has had 51 companies do work over the last 5 years.

Lien History

There has been 7 liens at this address with a reported total value of $722,092.73.

Project History


On this project at 601 W 2nd St, Austin, TX 78701 there have been 12 permits filed, 5 preliminary notices exchanged, 1 lien waiver exchanged between companies and 7 liens filed. Below you can find when the various project and payment events occurred over the last several years of data where available. You can also report a payment event if you’re on this project.

Overview

12

PERMITS FILED

5

PRELIMINARY NOTICES

1

LIEN WAIVERS

7

LIEN HISTORY

Payment Timeline

09/13/2024

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $10,000


Source: Levelset Data

06/14/2024

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $1,000


Source: Levelset Data

06/14/2024

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Google, Green Water Block 185

Over $60,000


Source: Levelset Data

03/15/2024

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $10,000


Source: Levelset Data

03/15/2024

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Google, Green Water Block 185

Over $60,000


Source: Levelset Data

03/15/2024

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $60,000


Source: Levelset Data

02/28/2024

Mechanics Lien Filed

Lien filed by Johnson Controls

Lien filed against DPR Construction, Green Water Block 185, The Porter Company

GC listed on lien: DPR Construction

$280,141


Source: Levelset Data

12/15/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $60,000


Source: Levelset Data

08/15/2023

Slow Payment Reported

Slow Payment Reported Against Google, Green Water Block 185, Horus Partners, Prism Electric Inc.

Over $10,000


Source: Levelset Data

07/14/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $60,000


Source: Levelset Data

07/14/2023

Slow Payment Reported

Slow Payment Reported Against Horus Partners, Prism Electric Inc.

Over $10,000


Source: Levelset Data

07/14/2023

Slow Payment Reported

Slow Payment Reported Against Black Box Network Services, DPR Construction

Over $1,000


Source: Levelset Data

06/13/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $60,000


Source: Levelset Data

05/15/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Porter Company

Over $10,000


Source: Levelset Data

05/15/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Google, The Porter Company

Over $10,000


Source: Levelset Data

05/15/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $60,000


Source: Levelset Data

05/15/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Porter Company

Over $10,000


Source: Levelset Data

04/14/2023

Slow Payment Reported

Slow Payment Reported Against The Porter Company

Over $10,000


Source: Levelset Data

03/15/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Google, The Porter Company

Over $10,000


Source: Levelset Data

03/15/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Porter Company

Over $10,000


Source: Levelset Data

02/27/2023

Lien Threatened

Lien threat sent to TDIndustries, Inc.

Over $10,000


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against Horus Partners, Prism Electric Inc.

Over $10,000


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $60,000


Source: Levelset Data

02/15/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Google

Over $10,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Porter Company

Over $10,000


Source: Levelset Data

01/13/2023

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Google, The Porter Company

Over $60,000


Source: Levelset Data

11/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Porter Company

Over $60,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Demo Company

Over $10,000


Source: Levelset Data

10/14/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Porter Company

Over $60,000


Source: Levelset Data

10/11/2022

Mechanics Lien Filed

Lien filed by Penhall Company | Claimant directly hired by GC

Lien filed against DPR Construction, Green Water Block 185

GC listed on lien: DPR Construction

$6,875


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Google, The Porter Company

Over $10,000


Source: Levelset Data

09/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Porter Company

Over $10,000


Source: Levelset Data

08/16/2022

Mechanics Lien Filed

Lien filed by KMP Plumbing Heating & Air (TX)

Lien filed against DPR Construction, Green Water Block 185, TDIndustries, Inc.

GC listed on lien: DPR Construction

$158,923


Source: Levelset Data

08/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Porter Company

Over $5,000


Source: Levelset Data

08/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, The Porter Company

Over $1,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, TRIO Electric

Over $5,000


Source: Levelset Data

07/15/2022

Slow Payment Reported

Slow Payment Reported Against The Porter Company

Over $1,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Permasteelisa North America

Less than $1,000


Source: Levelset Data

06/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Permasteelisa North America

Over $5,000


Source: Levelset Data

04/19/2022

Mechanics Lien Filed

Lien filed by W6 Construction

Lien filed against DPR Construction, Green Water Block 185

GC listed on lien: DPR Construction

$27,067


Source: Levelset Data

04/15/2022

Slow Payment Reported

Slow Payment Reported Against DLB Industries, DPR Construction, Green Water Block 185

Over $1,000


Source: Levelset Data

03/29/2022

Lien Threatened

Lien threat sent to SunGrow Landscape Services

Over $10,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, KMP Plumbing, Heating & Air

Less than $1,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, Permasteelisa North America

Over $10,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Permasteelisa North America

Over $10,000


Source: Levelset Data

03/15/2022

Slow Payment Reported

Slow Payment Reported Against DLB Industries, DPR Construction

Over $1,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, TRIO Electric

Over $5,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, TRIO Electric

Over $10,000


Source: Levelset Data

02/15/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Permasteelisa North America

Over $10,000


Source: Levelset Data

02/14/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Permasteelisa North America

Over $10,000


Source: Levelset Data

01/14/2022

Mechanics Lien Filed


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, Permasteelisa North America

Over $10,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Permasteelisa North America

Over $10,000


Source: Levelset Data

01/14/2022

Slow Payment Reported

Slow Payment Reported Against DPR Construction, TRIO Electric

Over $5,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $5,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Permasteelisa North America

Over $60,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, TRIO Electric

Over $10,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Google, Green Water Block 185

Over $10,000


Source: Levelset Data

12/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $5,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Patriot Erectors

Over $5,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Permasteelisa North America

Over $10,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $60,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against DLB Industries, DPR Construction

Over $60,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Google, Green Water Block 185

Over $60,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against DLB Industries, DPR Construction, Green Water Block 185

Over $60,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $5,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

11/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $60,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, KMP Plumbing, Heating & Air

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, TRIO Electric

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, Trammell Crow Company (TCC)

Over $1,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against DLB Industries, DPR Construction

Over $60,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Permasteelisa North America

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

10/15/2021

Slow Payment Reported

Slow Payment Reported Against DLB Industries, DPR Construction, Green Water Block 185

Over $60,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against DLB Industries, DPR Construction

Over $60,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $1,000


Source: Levelset Data

09/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, KMP Plumbing, Heating & Air

Over $10,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, KMP Plumbing, Heating & Air

Over $10,000


Source: Levelset Data

08/13/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, Trammell Crow Company (TCC)

Less than $1,000


Source: Levelset Data

07/15/2021

Mechanics Lien Filed

Lien filed by Marek Sawing and Drilling LLC

Lien filed against DPR Construction, Green Water Block 185, TDIndustries, Inc.

GC listed on lien: DPR Construction

$13,150


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against DLB Industries, DPR Construction, Green Water Block 185

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against DLB Industries, DPR Construction

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

07/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

06/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Less than $1,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

05/14/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

04/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, KMP Plumbing, Heating & Air

Over $60,000


Source: Levelset Data

03/15/2021

Mechanics Lien Filed

Lien filed by Capitol Concrete Contractors | Claimant directly hired by GC

Lien filed against DPR Construction, Green Water Block 185

GC listed on lien: DPR Construction

$47,450


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, KMP Plumbing, Heating & Air

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, TRIO Electric

Over $5,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $1,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

03/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $1,000


Source: Levelset Data

02/12/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, KMP Plumbing, Heating & Air

Over $10,000


Source: Levelset Data

01/15/2021

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $60,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against DLB Industries

Over $1,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against KMP Plumbing, Heating & Air

Over $10,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $60,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against Green Water Block 185, Hartford Casualty Insurance Company, KMP Plumbing, Heating & Air

Over $10,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against DPR Construction, Green Water Block 185, Trammell Crow Company (TCC)

Over $60,000


Source: Levelset Data

12/15/2020

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $1,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $60,000


Source: Levelset Data

11/13/2020

Slow Payment Reported

Slow Payment Reported Against KMP Plumbing, Heating & Air

Over $10,000


Source: Levelset Data

09/15/2020

Slow Payment Reported

Slow Payment Reported Against DPR Construction

Over $10,000


Source: Levelset Data

05/08/2020

Permit Filed

Permit Approved 

Contractors listed on Permit: DPR Construction, City of Austin (TX)

# 2020-071591 BP

$123,222,000


Permit Description

Parking Garage


Source: ConstructionMonitor

05/08/2020

Permit Filed

Permit Approved 

Contractors listed on Permit: DPR Construction, City of Austin (TX)

# 2020-071590 BP

$123,222,000


Permit Description

Office Building


Source: ConstructionMonitor

05/08/2020

Permit Filed

Permit Approved 

Contractors listed on Permit: DPR Construction

# 2020-071590 BP

$123,222,244


Source: ConstructionMonitor

Full Project Job Tree51

Companies


In this section, you can find all 51 known companies who have worked on projects at this address at each level. You'll be able to browse companies, find the information you need to get paid, or search for your next project partner.

Lender

Unknown Company

Property Owner

Bonded by Unknown

General Contractor (5)

Bonded by Federal Insurance Company (a Chubb Company)
Bonded by Federal Insurance Company (a Chubb Company)
Bonded by Federal Insurance Company (a Chubb Company)
Bonded by Federal Insurance Company (a Chubb Company)
Bonded by Federal Insurance Company (a Chubb Company)

Subcontractor (36)

Drilling Contractors
Subcontractor
Drafting and Design Contractors
Subcontractor
Subcontractor

Supplier (9)

ED
Equipment Depot
AR
Ahern Rentals, Inc.

Surety Companies (1)

FI
Federal Insurance Company (a Chubb Company)

Job Hierarchy


Lender

Unknown Company

Property Owner

Bonded by Unknown

General Contractor (5)

View All
Bonded by Federal Insurance Company (a Chubb Company)

Subcontractor (36)

View All
Drilling Contractors

Supplier (9)

View All

Need cash to buy materials for this job?

Levelset will pay for your materials.

You pay us back up to 120 days later.

Apply Now