Hi there, On a Lump Sum contract, the Specification lists for UPS battery type A or B is acceptable. Who decides which? I.e. Is it the Contractor who can benefit when choosing the lower price product. or is it the Engineer, who expects that the Contractor will have prices for the most erroneuos option in all cases, to cover himself and benefit if low price option is required Thanks Danni